Accurate, itemized cost estimations for factory sheds, PEB warehouses, and cold storage units across Taloja MIDC, Rabale, Mahape, Chakan, Bhiwandi, and Ambernath. Discover exact per-sq-ft civil, structural steel, and roofing costs.
Component-By-Component Pricing
Itemized Cost Breakdown (Per Sq Ft of Plinth Area)
Estimated rates reflect current 2026 steel, cement, and skilled labor rates across Mumbai Metropolitan Region (MMR).
| Work Component | Scope & Specifications | Approx. Rate (₹/Sq Ft) | % of Total Project |
|---|---|---|---|
| 1. Civil Foundations & Pedestals | Earthwork, RCC footings (M25), anchor bolts | ₹120 – ₹190 | 18% – 22% |
| 2. PEB Structural Steel Superstructure | Built-up columns, rafters, C/Z purlins, bracing | ₹180 – ₹290 | 35% – 40% |
| 3. Metal / UPVC / PUF Roofing Sheets | 0.50mm Galvalume / 3-layer UPVC / 50mm PUF | ₹85 – ₹195 | 15% – 20% |
| 4. Wall Cladding / Masonry Walls | Flyash brickwork up to 3m + metal side cladding | ₹70 – ₹130 | 10% – 12% |
| 5. Heavy Industrial Flooring (VDF/Trimix) | 150mm M25/M30 with steel fibers, floor hardener | ₹110 – ₹170 | 12% – 15% |
| Total Turnkey Factory Shed | Complete Ready-to-Operate Industrial Facility | ₹650 – ₹1,050 | 100% |
PEB Structure vs Conventional Steel Truss Shed
Why 85% of new factories in Navi Mumbai and Pune choose Pre-Engineered Buildings.
RECOMMENDED FOR FACTORIES
Pre-Engineered Building (PEB)
- Steel Weight: 25–35 kg/m² (tapered optimized sections)
- Erection Speed: 6 to 10 weeks for 20,000 sq ft shed
- Clear Spans: Column-free space up to 60 meters
- Foundation Cost: 20% cheaper due to lighter dead loads
- Warranty: 20+ years structural design warranty
TRADITIONAL METHOD
Conventional Steel Truss Shed
- Steel Weight: 40–55 kg/m² (standard heavy angle sections)
- Erection Speed: 14 to 20 weeks with heavy site welding
- Clear Spans: Requires intermediate supporting columns
- Foundation Cost: Heavier RCC footings required
- Maintenance: Periodic painting required at welded joints
Get a Custom BOQ & Cost Estimation for Your Industrial Plot
Provide your land dimensions, eave height requirement, and location to receive an engineer-certified structural quote within 24 hours.